Challenge

The expansion of the Oilink facilities at Manila Bay in the Luzon region of the Philippines included the construction of a new unloading platform for oil discharge vessels. This platform would be reached by a jetty, which needed to have the capacity to accommodate the discharge from up to six vessels which could be simultaneously docked at the unloading platform. It also needed to be able to carry 42 tonne axle load vehicles.

The original scope of work for the project was to build a concrete structure, extending out into the bay, and supported on concrete piers. The piers would themselves be supported on pilings driven into the bed of the bay. However, after twelve months, only the piling work had been completed. Bad weather and lack of skilled labour were attributed to the delay, and the anticipated project deadline of 16 months was no longer on track.

Solution

Oilink understood that a delay represented an economical threat to the company’s operations at this facility and at its current rate, the project was not going to be delivered on time. An alternative plan was needed to find a quick and viable solution. Oilink sought advice from Mabey Bridge who came in to assess the site. Mabey Bridge recommended that a Compact 200™ bridge would be an ideal solution – it could be built using proprietary equipment that was widely available and it would more than adequately meet the technical specifications of the proposed platform.

As a point of interest, the piles, which had already been driven for the original concrete piers, were located at 17m intervals. If a modular panel bridge had been specified from the outset, the piers could have been installed at 40m intervals, resulting in a significant reduction in materials and labour.

During installation the Compact 200™ bridge was craned into place over the first three pilings. It was then cantilever-launched, with bays of bridging assembled on a work barge and lifted into position for fixing to the concrete piers.

The final section of the bridge jetty was assembled only 28 days after the initial launch.

Result

Oilink now has a fully functional jetty which was ready in a significantly shorter time-frame than had been feared after the initial piling work. The Compact 200™ bridge has accommodated several bespoke features, including an internal roadway with grid deck sections to allow for sea swell dispersal, a pipe rack at both sides to position discharge pipes from vessel to oil tanks, four unloading platforms and a manoeuvring platform at the end to allow vehicles to turn around.

Products

Bridge Assessment Services

Bridge assessments to check on bridge safety, residual capacity and maintenance requirements.

view product

Bridge Installation Advice

Bridge installation advice to ensure a rapid, safe and trouble-free bridge-build.

view product

Mabey Compact 200

Mabey’s most popular modular bridging system. Supplied in a variety of spans and widths, and configured from pre-engineered components for ease of installation

view product

browse more products

Related Projects

Chevron Oil Refinery Bridge, UK

SectorsEnergy and Pipelines, Oil and Gas

CategoriesBridging, Engineering and Project Services

LocationPembroke, United Kingdom

view project

LNG Upstream Infrastructure Project, Papua New Guinea

SectorsInfrastructure, Oil and Gas

CategoriesBridging, Engineering and Project Services

LocationPapua New Guinea

view project

Trans Adriatic Pipeline, Albania

SectorsEnergy and Pipelines, Infrastructure

CategoriesBridging, Engineering and Project Services, Major Projects

LocationAlbania

view project

view all projects