Challenge

IWM Duxford is a former RAF fighter station dating back to WW1, with a long and distinguished history, particularly famous for its role in the Battle of Britain in 1940. Today it is one of the world’s leading and most popular aviation museums, housing some 200 aircraft ranging from ‘pioneering’ biplanes to modern day jets.

The original access bridge, installed in 1984 and used by vehicles and pedestrians to cross the main A505 trunk road in Duxford, needed replacing and this prompted the museum to approach Mabey Bridge. The central span of the bridge crosses the main road, and the ramp spans and the two piers sit on IWM land, which is in a conservation area. The initial enquiry was simply for background information on the original C100 bridge and Mabey Bridge provided the relevant historical and technical information. IWM’s own consulting engineers then conducted a comprehensive survey of the bridge and recommended that the old bridge was replaced, keeping the two piers, which were to be re-used.

Solution

Mabey Bridge’s Digital Engineering Department supported the scoping work using the latest advances in digital design and imaging technology. Armed with this capability the Mabey Bridge Site Advisor, Steve Morgan, was able to present the IWM Team with the optimal solution. A three span Compact 200™, 58.878m x 3.15m with anti-skid decking was specified. It is the natural successor to the older Compact 100 structure, and also conforms to the planning constraints which dictated a ‘like for like’ replacement. A bespoke parapet rail system, powder coated green, was also specified and fitted across the entire length of bridge.

Result

The IWM Team was comprehensively supported throughout the project by a multi-disciplinary Mabey Bridge Team to address their technical, costing and environmental requirements in a very short timeframe.

The new Compact 200™ met the ‘like for like’ requirement of a pre-engineered steel pinned girder panel through-type structure, with the main span in double-single configuration, and ramp spans in single-single format to replicate the existing bridge as far as possible.

The project was completed in good time, with minimal disruption to the public and IWM business. The required road closure for the lifting of the new bridge exceeded expectations with the new structure installed in just one weekend.

Products

Bridge Installation Advice

Bridge installation advice to ensure a rapid, safe and trouble-free bridge-build.

view product

Mabey Compact 200

Mabey’s most popular modular bridging system. Supplied in a variety of spans and widths, and configured from pre-engineered components for ease of installation

view product

Mabey SmartEdge™ System

The Mabey SmartEdge™ System is a unique modular bridge accessory which can be personalised with bespoke graphics, logos and colours.

view product

browse more products

Related Projects

Guardbridge Energy Centre, University of St Andrews

SectorsConstruction, Oil and Gas

CategoriesBridging

LocationScotland, UK

view project

Gyfeillion Bridge, Wales

SectorsGovernment, Infrastructure, Transport

CategoriesBridging

LocationHopkinstown, Wales

view project

The Royal Danish Army Training

SectorsDefence, Government, Humanitarian Aid and Disaster Relief

CategoriesBridging, Engineering and Project Services, Training and Education

LocationCopenhagen, Denmark

view project

view all projects