About Us

Corus Bridge, Newport, WalesMabey Bridge is a specialist supplier of high quality steel bridging, infrastructure, wind turbine towers and heavy plated structural steelwork to markets across the globe. Based in Chepstow, South Wales, the company’s history can be traced back to the construction of Brunel’s Wye railway bridge in 1849. Click here to read more about the history of Mabey Bridge.

The company’s innovative range of modular bridges has been installed in over 140 countries. The rapid erect steel panel bridges provide effective infrastructure solutions in major cities, disaster stricken areas and remote regions.

Construction and Erection, Marr Wind FarmAs well as pre-engineered steel bridging, Mabey Bridge also manufacture wind turbine towers, heavy structures, sign gantries and monopiles in the UK. The company specialises in the fabrication and construction of heavy plate steel structures for the highway bridge, rail bridge and foot bridge markets. Mabey Bridge has close relationships with many of the UK’s leading civil engineering contractors and is distinguished by an outstanding track record in the supply, delivery and installation of bridge projects.

The company recently entered the renewable energy market with a significant private investment into a facility dedicated to the fabrication and protective treatment of wind turbine towers and other tubular steelwork for the UK’s energy industry. Mabey Bridge also brings its experience in heavy lifting and site erection to the renewable energy market through wind farm installation.

Bridge installation, Health and SafetyMabey Bridge has extensive experience of being involved from the earliest possible stages of a project, significantly contributing to the design development, maximising buildability and minimising steelwork costs and lead times. Having a wealth of knowledge and experience in the design and supply of bridges and superstructures, together with the provision of specialist on site technical assistance to help with construction. We assist with further project requirements such as site surveys, substructure design or a complete erection package; and adopt a fully flexible approach aimed at meeting each client’s specific needs. This is just one part of the unrivalled service that we offer to ensure complete customer satisfaction and to maximise repeat business.

All of Mabey Bridge’s activities are carried out in accordance with the company’s Integrated Management Systems which are certified in accordance with OHSAS 18001, ISO 14001 and ISO 9001:2000Click here for more information on Safety, Health, Environment and Quality Policy.

Ethics is at the heart of Mabey Bridge’s approach to trading. Mabey Bridge is the first organisation to be accredited to BS 10500, a landmark achievement in both the UK and International Anti-Bribery Management Systems. Click here to read more.